Enercon EP2 Windkraftanlagen v2.0.0.0 LS22
Enercon EP2 Windkraftanlagen v2.0.0.0 LS22
Enercon EP2 wind turbines with different hub heights.
Version 2.0.0.0
Purchase price and income have been recalculated and are now based on the nominal power, the rotor blade length and the tower height.
ALL systems can now be “visually” switched off (More information in the description!)
Changes to the rotor to make it compatible with the new “visual” shutdown
Hello everyone!
This mod consists of 6 wind turbines of the EP2 platform with different hub heights.
The following are the features of the plants:
All turbines adjust to the wind and change their speed depending on the wind speed.
Anemometers are animated and adjust to wind speed.
Obstacle marking adapts to the light conditions in the different seasons.
The income per hour and the daily maintenance costs are one thousandth of the purchase price.
The following systems are included:
Enercon E70 EP2: 54m, 75m and 98m hub height (Price each: €50,000)
Enercon E82 EP2: 69m, 108m and 138m hub height (price each: €75,000)
Enercon E92 EP2: 78m, 108m and 138m hub height (price each: €125,000)
Enercon E101 EP2: 99m, 135m and 149m hub height (Price each: €175,000)
Enercon E103 EP2: 98m, 1108m and 138m hub height (Price each: €200,000)
Enercon E115 EP2: 92m, 122m and 149m hub height (Price each: €275,000)
PLEASE NOTE:
These are not 1:1 images of the real models.
Only the hub height, the rotor diameter and the rough appearance are based on the real images!
This mod may be posted on other websites as long as the download leads to the LS-Modcompany download link!!!
Update 1.3.0.0:
Machine houses and hubs adjusted
Rotor blades adjusted
Update 1.2.0.0:
The latest update includes major changes to all facilities.
So there are new towers for all systems that come much closer to the real models than the old ones.
The rotor blades now also have the trailing edge segments typical of Enercon.
There were also minor adjustments, which can be found in the changelog.